|
|
Exploring the FACETS of Porta Con Structures:
Speed |
|
Long
before the site work begins, our precast foundation and
floor slab is poured, walls and exterior finishes are
assembled and piping and electric control boards are
installed.
Each element undergoes rigorous inspection during
manufacturing eliminating many onsite inspection
issues.
Our structures are shipped and set typically within 1
day. |
1893 Conowingo Rd., Rising Sun, Maryland 21911
Phone: 410-658-0900 Fax: 410-658-8550
|